Detailed alignment and drainage designs of section 4.1s Panagia – Grevena of Motorway Egnatia Odos (Greece)

Detailed alignment and drainage designs of section 4.1s Panagia – Grevena of Motorway Egnatia Odos (Greece)

Detailed alignment and drainage designs of section 4.1s Panagia – Grevena of Motorway Egnatia Odos (Greece)

 

Project Description

Subsections 4.1.1s, 4.1.2s and 4.1.3s of section 4.1s of Egnatia Motorway

  • Length: L=36.7Km
  • Design speed: Ve=100Km/h
  • Typical cross section: 2×2 traffic lanes with central reserve
LOCATION Greece
CLIENT EGNATIA ODOS SA
DATE 2003 – 2008
OBJECT Roads
COST Project Cost: Approx. 617 million €, Design Fee: 290,000 €
PROJECT INSIGHT

We provide answers to the most critical questions

We Are Commited to Engineering Excellence

Our commitment to Engineering Excellence means that we give every single effort to minimize the impact of our work on the environment, execute timely our projects and deliver the best cost effective solution to any engineering challenge we face.

GET AN ESTIMATE FOR YOUR PROJECT