Risk Assessment Study and supporting documentation for the production of Safety Files, at the tunnels of Dichalorema (693.22m) and Knimida (2,495.96m) (Greece)

Risk Assessment Study and supporting documentation for the production of Safety Files, at the tunnels of Dichalorema (693.22m) and Knimida (2,495.96m) (Greece)

Risk Assessment Study and supporting documentation for the production of Safety Files, at the tunnels of Dichalorema (693.22m) and Knimida (2,495.96m) (Greece)

 

Project Description

A Safety File was elaborated for each one of the existing tunnels “Dichalorema” and “Knimida” of PATHE motorway in order to meet the safety requirements set in the Directive 2004/54/EC and the Greek Presidential Decree 230/2007. The Safety File covers design, commissioning and operational phases of each tunnel. The contents of the Safety File are specified by the Tunnel Managing Authority.

LOCATION Greece
CLIENT NEA ODOS S.A.
DATE 2011 – 2016
OBJECT Roads
COST Services fee: 110.000 €

Design Scope & Services

PROJECT INSIGHT

We provide answers to the most critical questions

We Are Commited to Engineering Excellence

Our commitment to Engineering Excellence means that we give every single effort to minimize the impact of our work on the environment, execute timely our projects and deliver the best cost effective solution to any engineering challenge we face.

GET AN ESTIMATE FOR YOUR PROJECT