Project Description

Improvement of the railway links along the international Corridor X including the branch Xd by means of rehabilitation or modernisation of the line sections: a) Bitola- Kremenica, b) Kumanovo-Deljadrovci and c) Dracevo-Veles

  • Length of entire project: L=65km
  • Length of section Bitola-Kremenica: L=16km
  • Length of section Kumanovo-Deljadrovci: L=14km
  • Length of section Dracevo-Veles: L=35km
  • Design Speed: Ve=100Km/h

Including:

  • Bridges: 6 (L=110m)
  • Culverts: 38
  • Railway Stations: 1
  • Halts: 1
LOCATION North Macedonia
CLIENT MINISTRY OF FINANCE (NORTH MACEDONIA)
DATE 2012 – 2014
OBJECT Railways
COST Project Cost: Approx. 20.7 million €, Design Fee: 418,000 €
PROJECT INSIGHT

We provide answers to the most critical questions

We Are Commited to Engineering Excellence

Our commitment to Engineering Excellence means that we give every single effort to minimize the impact of our work on the environment, execute timely our projects and deliver the best cost effective solution to any engineering challenge we face.

GET AN ESTIMATE FOR YOUR PROJECT