Project Description
First Design and Build contract in SAR of a new railway line from Jubail industrial city to Dammam
- Length: L=114Km
- Design Speed: Vpass=250Km/h, Vfr=80Km/h
- Number of tracks: 1
Including:
- Bridges: 16 (L=1,650m)
- Railyard: 1
LOCATION | Saudi Arabia |
CLIENT | CJV TERNA – ALOMAIER, SAUDI RAILWAY (SAUDI ARABIA) |
DATE | 2013 – 2017 |
OBJECT | Railways |
COST | Project Cost: Approx. 170 million €, Design Fee: 2,200,000 € |
PROJECT INSIGHT
We provide answers to the most critical questions
We Are Commited to Engineering Excellence
Our commitment to Engineering Excellence means that we give every single effort to minimize the impact of our work on the environment, execute timely our projects and deliver the best cost effective solution to any engineering challenge we face.
GET AN ESTIMATE FOR YOUR PROJECT