Detailed design for the railway line Kumanovo – Beljakovce (Corridor VIII) (North Macedonia)
Detailed design for the railway line Kumanovo – Beljakovce (Corridor VIII) (North Macedonia)
Project Description
Improvement of existing and construction of new sections of the railway line Kumanovo – Beljakovce
- Length: L=30Km
- Design Speed: Ve=100Km/h
- Number of tracks: 1
Including:
- Bridges: 5 (L=320m)
- Overpasses: 6
- Underpasses: 11
- Stations: 3
LOCATION | North Macedonia |
CLIENT | Macedonian Railway Infrastructure (PEMRI / EBRD funds) |
DATE | 2012 – 2013 |
OBJECT | Railways |
COST | Project Cost: Approx. 48.8 million €, Design Fee: 287,000 € |
PROJECT INSIGHT
We provide answers to the most critical questions
We Are Commited to Engineering Excellence
Our commitment to Engineering Excellence means that we give every single effort to minimize the impact of our work on the environment, execute timely our projects and deliver the best cost effective solution to any engineering challenge we face.
GET AN ESTIMATE FOR YOUR PROJECT