June 11, 2021
Design of new railway line Kalambaka – Kozani, section Demetra – Siatista (Greece)
Design of new railway line Kalambaka – Kozani, section Demetra – Siatista (Greece)
Project Description
New railway line for section Demetra – Siatista
- Length: L=46km
- Length of Grevena railway connection: L=8.3km
- Length of local/service roads: L=37km
- Design Speed: Ve=160Km/h
Including:
- Bridges: 38 (L=7,950m)
- Tunnels: 18 (L=12,760m)
- C&C: 2
- Overpasses: 4
- Underpasses: 3
- Railway Stations: 4
LOCATION | Greece |
CLIENT | OSE S.A. (GREEK RAILWAYS ORGANIZATION) |
DATE | 2006 – 2011 |
OBJECT | Railways |
COST | Project Cost: Approx. 350 million €, Design Fee: 1,680,000 € |
PROJECT INSIGHT
We provide answers to the most critical questions
We Are Commited to Engineering Excellence
Our commitment to Engineering Excellence means that we give every single effort to minimize the impact of our work on the environment, execute timely our projects and deliver the best cost effective solution to any engineering challenge we face.
GET AN ESTIMATE FOR YOUR PROJECT