New railway line from Tithorea Railway Station to Domokos Railway Station
- Length: L=52Km
- Design Speed: Ve=160Km/h
- Number of tracks: 2
Including:
- Bridges: 23 (L=4.500m)
- Tunnels: 16 (L=20,000m)
- Overpasses: 5
- Underpasses: 12
- Stations: 2
Including:
LOCATION | Greece |
CLIENT | ERGA OSE S.A. (Subsidiary of the Greek Railways Organization) |
DATES | 2002 – 2011 |
CATEGORY | Rail |
COST | Approx. 445 million €, Design Fee: 1,550,000 € |
Our diverse portfolio represents two decades of construction experience driven by our passion for quality and outstanding engineering>
Anim pariatur cliche reprehenderit, enim eiusmod high life accusamus terry richardson ad squid. 3 wolf moon officia aute, non cupidatat skateboard dolor brunch.
Food truck quinoa nesciunt laborum eiusmod. Brunch 3 wolf moon tempor, sunt aliqua put a bird on it squid single-origin coffee nulla assumenda shoreditch et.
Our commitment to Engineering Excellence means that we give every single effort to minimize the impact of our work on the environment, execute timely our projects and deliver the best cost effective solution to any engineering challenge we face.
GET AN ESTIMATE FOR YOUR PROJECT