June 11, 2021
Preliminary and Detailed designs & Project Studies (FSs, CBAs, EIA) for railway sections along Corridor X including branch Xd (North Macedonia)
Preliminary and Detailed designs & Project Studies (FSs, CBAs, EIA) for railway sections along Corridor X including branch Xd (North Macedonia)
Project Description
Improvement of the railway links along the international Corridor X including the branch Xd by means of rehabilitation or modernisation of the line sections: a) Bitola- Kremenica, b) Kumanovo-Deljadrovci and c) Dracevo-Veles
- Length of entire project: L=65km
- Length of section Bitola-Kremenica: L=16km
- Length of section Kumanovo-Deljadrovci: L=14km
- Length of section Dracevo-Veles: L=35km
- Design Speed: Ve=100Km/h
Including:
- Bridges: 6 (L=110m)
- Culverts: 38
- Railway Stations: 1
- Halts: 1
LOCATION | North Macedonia |
CLIENT | MINISTRY OF FINANCE (NORTH MACEDONIA) |
DATE | 2012 – 2014 |
OBJECT | Railways |
COST | Project Cost: Approx. 20.7 million €, Design Fee: 418,000 € |
PROJECT INSIGHT
We provide answers to the most critical questions
We Are Commited to Engineering Excellence
Our commitment to Engineering Excellence means that we give every single effort to minimize the impact of our work on the environment, execute timely our projects and deliver the best cost effective solution to any engineering challenge we face.
GET AN ESTIMATE FOR YOUR PROJECT