Design and design supervision services for the construction of the new line from Parnu to Estonian – Latvian border – RBR 2018 (Estonia)

Design and design supervision services for the construction of the new line from Parnu to Estonian – Latvian border – RBR 2018 (Estonia)

Design and design supervision services for the construction of the new line from Parnu to Estonian – Latvian border – RBR 2018/ (RAIL BALTICA)

 

Project Description

The scope of services deals with the new railway mainline section north of Pärnu up to Estonian/Latvian state border with a total length of 93,5km including approximately 45 new major structures (19 railway bridges, 15 road bridges, 11 eco-ducts) and 4 stations / passing loops. The design is elaborated considering double track for the whole length of the main line. The line is a mixed traffic line, where maximum design speed for passenger trains is 249km/h and 120km/h for freight trains. All design services are to be elaborated in BIM environment.

LOCATION Estonia
CLIENT RAIL BALTICA
DATE 2020 – 2023
OBJECT Railways
COST Design Fee 1.000.000€ for Value Engineering Stage
PROJECT INSIGHT

We provide answers to the most critical questions

We Are Commited to Engineering Excellence

Our commitment to Engineering Excellence means that we give every single effort to minimize the impact of our work on the environment, execute timely our projects and deliver the best cost effective solution to any engineering challenge we face.

GET AN ESTIMATE FOR YOUR PROJECT