Detailed Design and Environmental and Social Impact Assessment for Motorway A4 Skopje - Blace


  • Client: EBRD-EIB (Hill International)
  • Dates: 09/2018 ~03/2022
  • Category: ROAD
  • Cost: Design Fee 2,825,751 €
  • Tags:

Project Description

Elaboration of the Detailed Design and Environmental and Social Impact Assessment and Tender Documents for the Motorway A4 Skopje - Blace. 
  • Project total length: 12,43km, 
  • Design speed 100km/h. 
  • Bridges: 5
  • Tunnels: 3
  • UP: 7

Design Scope & Services:

  • Conceptual Design
  • Detailed Design for the Road and Interchange
  • Detailed Design of Culverts
  • Detailed Design of Reinforced Embankment at CH. 0+138 to CH.0+382
  • Detailed Design of Structures
  • Detailed Design of Tunnels
  • Detailed Hydraulics Design
  • Environmental and Social Impact Assessment (ESIA)
  • Environmental Elaborate
  • Geotechnical Investigation and Design
  • Infrastructure Design
  • Safety & Signage Design
  • Tender Documents
  • Topo Survey

Related Projects

we’d love to build something
great together.