Detailed Design for the improvement of road Krapsi – Anatoliki – Kotomista – Paleochori – Prosilio – Christi – Pramanta (Greece)


  • Client: PREFECTURE OF IOANNINA (GREECE)
  • Dates: 2008 – 2009
  • Category: ROAD
  • Cost: Project Cost: Approx. 96 million €, Design Fee: 1,240,000 €
  • Tags:

Project Description

Improvement of two existing sections of a connecting road axis to Egnatia Motorway (I/C Tzoumerka) – Pramanta:a) Krapsi – Kotomista – Paleochori and b) Paleochori –Prosilio – Christi – Pramanta

  • Environment: Mountainous (adverse)
  • Length: L=28Km
  • Design speed: Ve=50Km/h
  • Typical cross section: 1 traffic lane per direction
Including:
  • At-grade intersections: 13
  • Bridges: 23 (L=2.090m)
  • Tunnels: 3 (L=485m)

Design Scope & Services:

  • Alignment
  • Cadastre
  • Environmental
  • Geological
  • Geotechnical
  • Land Surveying
  • Project Management

Related Projects

we’d love to build something
great together.