Completion of design of National Road Katerini – Ag. Dimitrios, Pieria Prefecture (Greece)


  • Client: PREFECTURE OF CENTRAL MACEDONIA (GREECE)
  • Dates: 2009 – 2017
  • Category: ROAD
  • Cost: Project Cost: Approx. 15 million €, Design Fee: 380,000 €
  • Tags:

Project Description

Improvement of the existing national road section Foteina – Ag. Dimitrios of the National Road Katerini – Ag. Dimitrios

  • Length: L=16.1Km
  • Design speed: Ve=60Km/h & 70Km/h
  • Typical cross section: 1 traffic lane per direction with multi-use lane, Including 5 at-grade intersections and 2 bridges (L=255m)

Design Scope & Services:

  • Alignment
  • Cadastre
  • Electromechanical
  • Environmental
  • Geological
  • Land Surveying
  • Project Management

Related Projects

we’d love to build something
great together.