Detailed Design for the improvement of Rural Road 29 Drosia - Dionisos - Nea Makri (Greece)


  • Client: PREFECTURE OF EAST ATTICA (GREECE)
  • Dates: 2009 - 2014
  • Category: ROAD
  • Cost: Project Cost: Approx. 33 million €, Design Fee: 555,000 €
  • Tags:

Project Description

Improvement of the existing rural road, which connects the northern suburbs of Athens with the wider eastern Attica region Urban section in Dionisos:

  • Length: L=1.73Km, Design speed: Ve=50Km/h
  • Typical cross section: 1 traffic lane per direction
  • At-grade intersections: 4
Urban section in Nea Makri:
  • Length: L=1.98Km, Design speed: Ve=50Km/h
  • Typical cross section: 1 traffic lane per direction
  • At-grade intersections: 6
Urban section of Dionisos - Nea Makri:
  • Length: L=11.79Km, Design speed: Ve=50Km/h
  • Typical cross section: 1 traffic lane per direction and 1 middle lane for overtaking, which is used alternately by both directions.
  • At-grade intersections: 6
Including:
  • Bridges: 1 (L=63m)

Design Scope & Services:

  • Alignment
  • Cadastre
  • Environmental
  • Geological
  • Geotechnical
  • Hydraulics
  • Land Surveying
  • Project Management
  • Signage & Signalling
  • Structural
  • Tender Documents

Related Projects

we’d love to build something
great together.