Preliminary and Detailed designs & Project Studies (FSs, CBAs, EIA) for railway sections along Corridor X including branch Xd (FYR Macedonia)


  • Client: MINISTRY OF FINANCE (FYR MACEDONIA)
  • Dates: 2012 – 2014
  • Category: RAIL
  • Cost: Project Cost: Approx. 20.7 million €, Design Fee: 418,000 €
  • Tags:

Project Description

Improvement of the railway links along the international Corridor X including the branch Xd by means of rehabilitation or modernisation of the line sections: a) Bitola- Kremenica, b) Kumanovo-Deljadrovci and c) Dracevo-Veles

  • Length of entire project: L=65km
  • Length of section Bitola-Kremenica: L=16km
  • Length of section Kumanovo-Deljadrovci: L=14km
  • Length of section Dracevo-Veles: L=35km
  • Design Speed: Ve=100Km/h
Including:
  • Bridges: 6 (L=110m)
  • Culverts: 38
  • Railway Stations: 1
  • Halts: 1

Design Scope & Services:

  • Alignment
  • Cadastre
  • Electrification
  • Environmental
  • Geotechnical
  • Hydraulics
  • Land Surveying
  • Structural
  • Tender Documents

Related Projects

we’d love to build something
great together.