Preliminary and Detailed designs and tender documentation for the railway line Drama - Paranesti (Northern Greece)


  • Client: OSE S.A. (GREEK RAILWAYS ORGANIZATION)
  • Dates: 2015 – 2017
  • Category: RAIL
  • Cost: Project Cost: Approx. 70 million €, Design Fee: 1,320,000 €
  • Tags:

Project Description

Improvement of the railway line Drama - Paranesti


- Length: L=36.3km
- Design Speed: Ve=160Km/h

Including:


- Bridges: 24 (L=552m)
- Tunnels: 3 (L=912m)
- Culverts: 91
- Service Stations: 1
- Passenger Stations: 2

Design Scope & Services:

  • Alignment
  • Cadastre
  • Environmental
  • Geological
  • Geotechnical
  • Hydraulics
  • Land Surveying
  • Project Management
  • Structural
  • Tender Documents

Related Projects

we’d love to build something
great together.