Detailed design and tender documentation for the new railway line Kriva Palanka - border with Republic of Bulgaria (Corridor VIII - FYR Macedonia)


  • Client: Macedonian Railway Infrastructure (PEMRI / EBRD funds)
  • Dates: 2015 – 2017
  • Category: RAIL
  • Cost: Project Cost: Approx. 368 million €, Design Fee: 1,375,000 €
  • Tags:

Project Description

New railway line in section Kriva Palanka–border with Republic of Bulgaria

  • Length: L=23.4km
  • Design Speed: Ve=100Km/h
  • Number of tracks: 1
Including:
  • Bridges: 41 (L=4,800m)
  • Tunnels: 22 (L=9,040m)
  • Overpasses: 8
  • Underpasses: 3
  • Stations: 2

Design Scope & Services:

  • Alignment
  • Electrification
  • Environmental
  • Geotechnical
  • Hydraulics
  • Hydrology
  • Land Surveying
  • Signalling & Telecom
  • Structural

Related Projects

we’d love to build something
great together.